The Stillfontein Cemetery in Maokeng, Kroonstad was inaccessible to the community during rainy season. With a low-lying gravel road and inadequate storm water drainage the area was in dire need of rehabilitation.

The project involved the construction of a road fill of 18 000m3 with a 5m wide paved surface 1km long. Storm water canals with a total length of 3.4km  were cleaned and re-shaped for effective storm water drainage of the area.